Kishon Port East Quay
 |
| Nature of project: |
|
Marine Construction & Civil Engineering works |
| Country: |
|
Israel |
| Location: |
|
Kishon Basin, Haifa Port. |
| Execution period: |
|
April 2001 – Final completion date December 2002 |
| Client: |
|
Israel Ports and Railway Authority |
| Description: |
|
Marine steel sheet pile bulkhead structure, that includes the
following main volumes:
- Steel sheet pile – 7,000 ton ( for front and anchor walls)
- Tie rod anchors – 1000 ton (40 meters length between front and
anchor wall)
- Concrete and reinforced concrete – 5,000 m3
- Earth movements (includes excavations and fillings) – 300,000 m3
- Piping works for electric and communication ducts
- Drainage system
- Asphalt pavements
- Portal cranes piled foundation along the new wharf
- Dredging works – 300,000 m3
- Sea water circulation system.
|
| Contract value in USD: |
|
16,000,000 |
| Equipment: |
|
|
| Company Status: |
|
Civil Engineering Contractor / Partner of a JV
with Piacentini Costruzioni Spa., Italy. |
| |
|
|